Repository.UpdateScheduledTask: Difference between revisions
Jump to navigation
Jump to search
Albert Szeto (talk | contribs) (Created page with '{{Template:APIClass|Repository Class|Repository}} == Method Syntax == {{APIName|UpdateScheduledTask(}} {{APIPrefix|ByVal}} {{APIName|task()}} {{APIPrefix|As}} {{APIName|[[cSche…') |
(No difference)
|
Revision as of 21:51, 19 September 2013
Method Syntax
UpdateScheduledTask(
ByVal
task()
As
cScheduledTask
) As Boolean
Updates the scheduled task in the repository.
Parameters
task The scheduled task to update in the repository.
Usage Example
Declare a new repository connection class.
Private WithEvents MyRepository As New Repository
Connect to the Synthesis repository.
Dim Success As Boolean = False Success = MyRepository.ConnectToRepository("RepositoryFileNamePath")
Get the list of scheduled tasks in the connected repository from the current project.
Dim ListOfScheduledTasks() As cScheduledTask ListOfScheduledTasks = MyRepository.GetAllScheduledTasks()
After updating the task, update the repository
Dim SuccessUpdateScheduledTask As Boolean = False SuccessUpdateScheduledTask = MyRepository.UpdateScheduledTask(ListOfScheduledTasks(0))