Template:WebNotes/MPCZonalEnhanced: Difference between revisions

From ReliaWiki
Jump to navigation Jump to search
No edit summary
No edit summary
 
(One intermediate revision by the same user not shown)
Line 18: Line 18:
|-
|-
| [[Image:Helpblue.png]]  
| [[Image:Helpblue.png]]  
| [http://help.SynthesisPlatform.net/mpc9/enhanced_zonal_analysis.htm the help file...]
| [http://help.synthesisplatform.net/mpc9/index.htm#enhanced_zonal_analysis.htm V9 Help] or[http://help.synthesisplatform.net/mpc10/index.htm#enhanced_zonal_analysis.htm V10 Help]
|-
|-



Latest revision as of 15:50, 30 April 2015

Webnotesbanner-MPC.png
Enhanced Zonal Analysis

The Zonal (Enhanced) rating system considers:

  • The size of the zone and the density of the equipment in the zone.
  • The potential effects of fire caused by a wiring/EWIS failure on adjacent wiring and systems.

It then prompts the analyst to consider whether a zonal GVI (general visual inspection) alone will be effective for the entire zone, or if it should be augmented with a standalone GVIs and/or detailed inspections (DETs).

Finally, ratings for the likelihood of accidental damage and environmental deterioration can be used to determine the appropriate inspection intervals. The team can then use the Tasks area to record the recommended tasks.

Learn more from...

Helpblue.png V9 Help orV10 Help











Docedit.png