Example Using Subdiagram Phase Blocks: Difference between revisions
Lisa Hacker (talk | contribs) No edit summary |
No edit summary |
||
Line 4: | Line 4: | ||
The RBDs for the Peak phase and the Off-Peak phase are: | The RBDs for the Peak phase and the Off-Peak phase are: | ||
<br> | <br> | ||
[[Image:Subdiagram Phase Peak and Off Peak.png|center| | [[Image:Subdiagram Phase Peak and Off Peak.png|center|500px]] | ||
Line 10: | Line 10: | ||
<br> | <br> | ||
[[Image:Day Shift and Night Shift.png|center| | [[Image:Day Shift and Night Shift.png|center|550px]] | ||
Line 16: | Line 16: | ||
<br> | <br> | ||
[[Image:Subdiagram phase Main.png|center| | [[Image:Subdiagram phase Main.png|center|350px]] | ||
Revision as of 07:14, 31 July 2012
New format available! This reference is now available in a new format that offers faster page load, improved display for calculations and images and more targeted search.
As of January 2024, this Reliawiki page will not continue to be updated. Please update all links and bookmarks to the latest references at BlockSim examples and BlockSim reference examples.
Consider a server that has two shifts each day, a day shift lasting 8 hours and a night shift lasting 16 hours. Within each shift, it has a peak period and an off-peak period with different durations.
The RBDs for the Peak phase and the Off-Peak phase are:
The phase diagrams for the Night Shift and Day Shift are:
The main phase diagram with phase subdiagram blocks is:
During the Peak phase, the reliability of Block A follows W(1.5,30) and the reliability of Block B follows W(1.5,40). During the Off-Peak phase, the reliability of Block A follows W(1.5,15) and the reliability of Block B follows W(1.5,20). In the Day Shift diagram, both blocks have CM and PM with duration = 1 hour; in the Night Shift diagram, both blocks have CM and PM with duration = 2 hours. In the Day Shift diagram, the duration of the Off-Peak phase is 4 hours and the duration of the Peak phase is 3 hours. In the Night Shift diagram, the duration of the Off-Peak phase is 8 hours and the duration of the Peak phase is 6 hours.
The system log for 2 days (48 hours) is shown in the figure below.
- At 5.4 hours, in the Peak phase of the Day Shift diagram, Block A fails. After this Peak phase, Block A gets CM and Block B gets PM in the maintenance phase.
- At 19.9 hours, in the Peak phase of the Night Shift diagram, Block A fails again. After this Peak phase, Block A gets CM and Block B gets PM in the maintenance phase.
- At 40.6 hours, in the Peak phase of the Night Shift diagram, Block A fails again. After this Peak phase, Block A gets CM and Block B gets PM in the maintenance phase.