Repository.Task.UpdateCorrectiveTask: Difference between revisions

From ReliaWiki
Jump to navigation Jump to search
No edit summary
No edit summary
Line 1: Line 1:
{{Template:APIClass|Repository Class|Repository}}
{{Template:APIClass|Repository Class|Repository}}
{{Template:Repository.UpdateCorrectiveTask.Cmt}} {{Template:BooleanReturn.Cmt}}
Updates the specified task in the repository. {{Template:BooleanReturn.Cmt}}


== Syntax  ==
== Syntax  ==
Line 7: Line 7:


Parameters
Parameters
:''task'': The [[cCorrectiveTask Class|cCorrectiveTask]] or [[cScheduledTaskClass|cScheduledTask]] to update.
:''task'': The [[cCorrectiveTask Class|cCorrectiveTask]] or [[cScheduledTask Class|cScheduledTask]] to update.


== Usage Example ==
== Usage Example ==

Revision as of 20:52, 12 March 2014


Updates the specified task in the repository. Returns True if successful, otherwise returns False.

Syntax

  • UpdateCorrectiveTask( task As cCorrectiveTask )As Boolean Updates the corrective task in the repository.
  • UpdateCorrectiveTask( task As cScheduledTask )As Boolean Updates the scheduled task in the repository.

Parameters

task: The cCorrectiveTask or cScheduledTask to update.

Usage Example

Declare a new repository connection class.

       Private WithEvents MyRepository As New Repository

Connect to the Synthesis repository.

       Dim Success As Boolean = False
       Success = MyRepository.ConnectToRepository("RepositoryFileNamePath")

Get the list of corrective tasks in the connected repository from the current project.

       Dim ListOfCorrectiveTasks() As cCorrectiveTask
       ListOfCorrectiveTasks = MyRepository.GetAllCorrectiveTasks()

After updating the task, update the repository

       Dim SuccessUpdateCorrectiveTask As Boolean = False
       SuccessUpdateCorrectiveTask = MyRepository.UpdateCorrectiveTask(ListOfCorrectiveTasks(0))