Repository.Task.UpdateCorrectiveTask: Difference between revisions
Jump to navigation
Jump to search
Chris Kahn (talk | contribs) No edit summary |
Chris Kahn (talk | contribs) No edit summary |
||
Line 1: | Line 1: | ||
{{Template:APIClass|Repository Class|Repository}} | {{Template:APIClass|Repository Class|Repository}} | ||
Updates the specified task in the repository. {{Template:BooleanReturn.Cmt}} | |||
== Syntax == | == Syntax == | ||
Line 7: | Line 7: | ||
Parameters | Parameters | ||
:''task'': The [[cCorrectiveTask Class|cCorrectiveTask]] or [[ | :''task'': The [[cCorrectiveTask Class|cCorrectiveTask]] or [[cScheduledTask Class|cScheduledTask]] to update. | ||
== Usage Example == | == Usage Example == |
Revision as of 20:52, 12 March 2014
Updates the specified task in the repository. Returns True if successful, otherwise returns False.
Syntax
- UpdateCorrectiveTask( task As cCorrectiveTask )As Boolean Updates the corrective task in the repository.
- UpdateCorrectiveTask( task As cScheduledTask )As Boolean Updates the scheduled task in the repository.
Parameters
- task: The cCorrectiveTask or cScheduledTask to update.
Usage Example
Declare a new repository connection class.
Private WithEvents MyRepository As New Repository
Connect to the Synthesis repository.
Dim Success As Boolean = False Success = MyRepository.ConnectToRepository("RepositoryFileNamePath")
Get the list of corrective tasks in the connected repository from the current project.
Dim ListOfCorrectiveTasks() As cCorrectiveTask ListOfCorrectiveTasks = MyRepository.GetAllCorrectiveTasks()
After updating the task, update the repository
Dim SuccessUpdateCorrectiveTask As Boolean = False SuccessUpdateCorrectiveTask = MyRepository.UpdateCorrectiveTask(ListOfCorrectiveTasks(0))