BlockSim Example: Phase with Failure or Success Paths: Difference between revisions
Dingzhou Cao (talk | contribs) |
Dingzhou Cao (talk | contribs) |
||
Line 28: | Line 28: | ||
The Block Up/Down plot is as followings: | The Block Up/Down plot is as followings: | ||
#At the first cycle (0- | #At the first cycle (0-100 for Phase 1 and 200-600 for Phase 2), there is no failure, thus after Phase 2, Phase 1 is executed (back to Phase 1 after this cycle). | ||
#At | #At 616 (Phase 1 of the second cycle), Block A fails. System doesn't enter Maintenance Phase 3 immediatly because in Phase 1, Block A and Block B are parallel. Only failure of Block A doesn't bring system down. | ||
#At | #At 700, after Phase 1, system goes into Phase 2. In Phase 2, failure of Block A (passed from Phase 1) bring the system down because in Phase 2, Block A is in series with Blokc B. Thus system goes into Maintenance Phase 3 immdediately. Block B is not down, thus it gets PM with duration 20 hours. Block A gets CM with duration 100 hours. | ||
#At | #At 1669, Block A fails in Phase 2 which bring down the system and system goes into Maintenance Phase 3 immdediately. Block A gets CM and Block B gets PM.<br> | ||
[[Image:Phase Up Down plot for Example 1.png|thumb|center|500px]] | [[Image:Phase Up Down plot for Example 1.png|thumb|center|500px]] |
Revision as of 18:10, 5 October 2011
Phase with F/S links
Purposes
The purposes of this example is to illustrate how to apply F/S links in Phase simulation.
- For a F link, on system failure, system go to somewhere immediately when failure occurs.
- For a S link, if there is no system failure during this phase, system goes to somewhere by the end of the current phase.
RBDs for Phase and settings
The RBDs for Phase 1 and Phase 2 are as followings:
In Phase 1, Block A follows Weibull distribution with Beta = 1.5 and Eta = 1000 hours. Block B follows Weibull distribution with Beta = 1.5 and Eta = 1200 hours. No maintenance.
In Phase 2, Block A follows Weibull distribution with Beta = 1.5 and Eta = 900 hours. Block B follows Weibull distribution with Beta = 1.5 and Eta = 1150 hours. No maintenance.
Example 1
The Phase diagram is as followings:
Maintenance phase has a CM with duration 80 hours and PM with duration 20 hours for both Block A and B.
Phase 1 has duration 100 hours and Phase 2 has duration 500 hours.
If there is no failure in Phase 1, upon finish, it goes to Phase 2. If there is a failure in Phase 1, it would go to Maintenance Phase 3 immediately. If there is no failure in Phase 2, upon finish, it goes back to Phase 1. If there is a failure in Phase 2, it would go to Maintenance Phase 3 immediately.
The Block Up/Down plot is as followings:
- At the first cycle (0-100 for Phase 1 and 200-600 for Phase 2), there is no failure, thus after Phase 2, Phase 1 is executed (back to Phase 1 after this cycle).
- At 616 (Phase 1 of the second cycle), Block A fails. System doesn't enter Maintenance Phase 3 immediatly because in Phase 1, Block A and Block B are parallel. Only failure of Block A doesn't bring system down.
- At 700, after Phase 1, system goes into Phase 2. In Phase 2, failure of Block A (passed from Phase 1) bring the system down because in Phase 2, Block A is in series with Blokc B. Thus system goes into Maintenance Phase 3 immdediately. Block B is not down, thus it gets PM with duration 20 hours. Block A gets CM with duration 100 hours.
- At 1669, Block A fails in Phase 2 which bring down the system and system goes into Maintenance Phase 3 immdediately. Block A gets CM and Block B gets PM.
Example 2
The Phase diagram is as followings:
Everything is the same as that in Example 1 except that the link from Phase 2 to Maintenance Phase 3 changes from F link to S link. This means that whether or not there is a failure in Phase 2, the system would go to Maintenance Phase 3 after Phase 2. But if there is a failure in Phase 2, system would go to Maintennace Phase 3 after Phase 2, not immediately.
The Block Up/Down plot is as followings:
- At the first cycle (0-500 for Phase 1 and 500-600 for Phase 2), there is no failure, thus after Phase 2, the system go to Maintennace Phase 3 for PM for both Block A and B with duration 20 hours.
- At 1171, Block A fails in Phase 2. Due to the parallel system structure in this phase, this failure doesn't bring system down. However, after Phase 2, system still go to Maintenance Phase 3.
- At 2835, Block A fails in Phase 1. Due to the series system structure in this phase, this failure bring the system down and thus system go to Maintenance Phase 3 immediately.