ALTADataSet.AddSuspensionInterval

From ReliaWiki
Revision as of 18:12, 11 February 2014 by Chris Kahn (talk | contribs)
Jump to navigation Jump to search


Adds a suspension interval and associated stress level to the data set.

Method Syntax

  • AddSuspensionInterval( ByVal StartValue As Double , ByVal EndValue As Double , ByVal NumberInGroup As Integer , ByRef Stress() As Object )
  • AddSuspensionInterval( ByVal StartValue As Double , ByVal EndValue As Double , ByVal NumberInGroup As Integer , ByRef Stress1 As Object )
  • AddSuspensionInterval( ByVal StartValue As Double , ByVal EndValue As Double , ByVal NumberInGroup As Integer , ByRef Stress1, Stress2 As Object )

Parameters

StartValue The starting value of this suspension interval.

EndValue The ending value of this suspension interval.

NumberInGroup The number of units that were suspended during this interval.

Stress(): An array containing numeric stress values or references to added ALTAStressProfiles.
Stress1: A numeric stress value or reference to an added ALTAStressProfile.
Stress2: A numeric stress value or reference to an added ALTAStressProfile.

Usage Example

Declare the ALTADataSet. See New ALTADataSet for additional details.

       Dim ALTADS as New ALTADataSet

Declare an ALTAStressProfile. See ALTAStressProfile for additional details.

       Dim sp = New ALTAStressProfile("Profile1")
       sp.RepeatCycle = True
       sp.AddSegment(1, 250)
       sp.AddSegment(2, 300)
       sp.AddSegment(3, 400)

Add values to the raw data.

       ALTADS.AddSuspensionInterval(1, 5, 1, sp)
       ALTADS.AddSuspensionInterval(6, 10, 1, sp)
       ALTADS.AddSuspensionInterval(11, 15, 1, sp)