Repository.Task.AddCorrectiveTask

From ReliaWiki
Revision as of 20:52, 3 December 2013 by John Leavitt (talk | contribs) (Protected "Repository.AddCorrectiveTask" ([edit=sysop] (indefinite) [move=sysop] (indefinite)) [cascading])
Jump to navigation Jump to search


Adds a corrective task

Method Syntax

AddCorrectiveTask( ByVal task() As cCorrectiveTask ) As Boolean
Saves the corrective task in the repository.

Parameters

task The new corrective task to add to the repository.

Usage Example

Declare a new repository connection class.

       Private WithEvents MyRepository As New Repository

Connect to the Synthesis repository.

       Dim Success As Boolean = False
       Success = MyRepository.ConnectToRepository("RepositoryFileNamePath")

Declare a new cCorrectiveTask.

       Dim newCorrectiveTask As New cCorrectiveTask("NewCorrectiveTask1")

After creating the task, update the repository

       Dim SuccessAddCorrectiveTask As Boolean = False
       SuccessAddCorrectiveTask = MyRepository.AddCorrectiveTask(newCorrectiveTask)