Sequential Data with Failure Modes - Logistic Model: Difference between revisions

From ReliaWiki
Jump to navigation Jump to search
No edit summary
No edit summary
Line 68: Line 68:
[[Image:rga8.16.png|center|400px|Reliability vs. Time plot.]]
[[Image:rga8.16.png|center|400px|Reliability vs. Time plot.]]
<br></li>
<br></li>
<li>The next figure displays the launch when the reliability goal of 99.5% will be achieved.
<li>The next figure displays the number of launches before the reliability goal of 99.5% will be achieved.
<br>
<br>
[[Image:rga8.17.png|center|400px|Calculate when the reliability goal of 99.5% will be achieved.]]
[[Image:rga8.17.png|center|400px|Calculate when the reliability goal of 99.5% will be achieved.]]

Revision as of 17:22, 12 June 2014

RGA Examples Banner.png


New format available! This reference is now available in a new format that offers faster page load, improved display for calculations and images and more targeted search.

As of January 2024, this Reliawiki page will not continue to be updated. Please update all links and bookmarks to the latest references at RGA examples and RGA reference examples.




This example appears in the Reliability Growth and Repairable System Analysis Reference.


Consider the data given in the Missile Launch Test example. Now suppose that the engineers assigned failure modes to each failure and that the appropriate corrective actions were taken.

The table below presents the data.

  1. Find the Logistic reliability growth curve that best represents the data.
  2. Plot it comparatively with the raw data.
  3. If design changes continue to be incorporated and the testing continues, when will the reliability goal of 99.50% be achieved?
  4. If design changes continue to be incorporated and the testing continues, what will be the attainable reliability at the end of the 35th launch?
Sequential Success/Failure Data with Modes
Launch Number Result Mode
1 F 2
2 F 1
3 S
4 F 3
5 F 3
6 S
7 S
8 S
9 F 2
10 S
11 F 1
12 S
13 S
14 S
15 S
16 S
17 S
18 S
19 S
20 S

Solution

  1. The next figure shows the entered data and the estimated parameters.
    Entered data and the estimated Logistic parameters.

  2. The next figure displays the Reliability vs. Time plot.
    Reliability vs. Time plot.

  3. The next figure displays the number of launches before the reliability goal of 99.5% will be achieved.
    Calculate when the reliability goal of 99.5% will be achieved.

  4. The last figure displays the reliability after the 35th launch.