**'''[[Global/Template Resources]]''' added/expanded. {{Font|[MODIFIED]|8|tahoma|italic|rgb(128,35,205)}} {{Font|[NEW]|8|tahoma|italic|rgb(205,16,118)}}  
**'''[[Global/Template Resources]]''' added/expanded. {{Font|[MODIFIED]|8|tahoma|italic|rgb(128,35,205)}} {{Font|[NEW]|8|tahoma|italic|rgb(205,16,118)}}  
*Synthesis-wide '''[[DFR Planner]]''' added. {{Font|[NEW]|8|tahoma|italic|rgb(205,16,118)}}  
*Synthesis-wide '''[[DFR Planner]]''' added. {{Font|[NEW]|8|tahoma|italic|rgb(205,16,118)}}  
**''DFR Planner is now included in all Synthesis applications and defined at the project level. DFR Planner removed from Xfmea/RCM++.''  
**''DFR planner is now included in all Synthesis applications and defined at the project level. DFR planner removed from Xfmea/RCM++.''  
**Also available via a web interface through the [[Synthesis Enterprise Portal]].  
**Also available via a web interface through the [[Synthesis Enterprise Portal]].  
**New '''[[DFR Resources]]''' added. {{Font|[NEW]|8|tahoma|italic|rgb(205,16,118)}}  
**New '''[[DFR Resources]]''' added. {{Font|[NEW]|8|tahoma|italic|rgb(205,16,118)}}  
Line 43: Line 43:
**Filter project view using the [[Global Item Filter]]. {{Font|[NEW]|8|tahoma|italic|rgb(205,16,118)}}  
**Filter project view using the [[Global Item Filter]]. {{Font|[NEW]|8|tahoma|italic|rgb(205,16,118)}}  
**Drag and drop project items from one project to another (in-lieu of the existing import functionality).
**Drag and drop project items from one project to another (in-lieu of the existing import functionality).
*'''[[Unified Actions]]'''. All Actions including test requests are unified across all products and can be managed/linked with the DFR Planner, as well as through the new web-based [[Synthesis Enterprise Portal]].  
*'''[[Unified Actions]]'''. All Actions including test requests are unified across all products and can be managed/linked with the DFR planner, as well as through the new web-based [[Synthesis Enterprise Portal]].  
*Parts Table Reference added to desktop applications for better tie in to XFRACAS. {{Font|[NEW]|8|tahoma|italic|rgb(205,16,118)}}
*Parts Table Reference added to desktop applications for better tie in to XFRACAS. {{Font|[NEW]|8|tahoma|italic|rgb(205,16,118)}}


Line 133: Line 133:
##Conversion considerations:  
##Conversion considerations:  
###In V9, DFR plans were simpler and could be added to any item in the system hierarchy.  
###In V9, DFR plans were simpler and could be added to any item in the system hierarchy.  
###The greatly expanded V10 DFR Planner is no longer item based/focused but instead project based.  
###The greatly expanded V10 DFR planner is no longer item based/focused but instead project based.  
###Upon conversion of older files, and if more than one DFR Planner is in the project, the plans will be merged into a single project level DFR Planner.  
###Upon conversion of older files, and if more than one DFR planner is in the project, the plans will be merged into a single project level DFR planner.  
#System Hierarchy Filtered View  
#System Hierarchy Filtered View  
#... {{Font|''In-process.  Additional details forthcoming''|8|tahoma|italic|gray}}...  
#... {{Font|''In-process.  Additional details forthcoming''|8|tahoma|italic|gray}}...  

Revision as of 16:02, 4 June 2014

SynthesisX buiding.png

Version 10 of the Synthesis Platform, Synthesis X, is currently in development with a planned release in Q4 of 2014. This document was last revised on.

ConstSX.gif


Forward

This page is a working draft of the changes/modifications planned for this Version. It is made publicly available to customers for input and feedback.


Comments, Questions or Feedback

You can use the new Synthesis sub-forum in the Reliability Discussion Forum for comments, questions, suggestions and/or feedback related to the planned modifications.

Alternatively, you can send an e-mail to the Development team.


Platform-Wide Modifications

These platform modifications are incorporated into all applications.


UI Changes Not Affecting Functionality

  1. UDFs for folios also changed to be a tree structure.
  2. Model window interface updated to use a tree structure similar to other resources.
  3. Interface improvements for Resource Manager:
    1. "Show All," "Show Only Unused" and "Show Only Duplicates" now indicate which option is selected.
    2. A status bar at the bottom of the window indicates which resource is selected, the Local/Global view option and the Selection option.


New Resources

  1. Metric. Shows calculated results value from a model or simulation result. Result values can be manually added to a history log and tracked over time. [NEW]

Application-Specific Modifications

All platform modifications are reflected and added to each individual application.
Additionally, this section presents specific major modifications that apply (are unique) to an individual application.


Weibull++Icon.png Weibull++/ALTA 10


  1. Fractional Failures Analysis added. Discount failures based on planned corrective actions effectiveness for what-if analysis. [NEW]
  2. Weibull/ALTA Multiple Projects added. Open multiple projects at the same time. [NEW]
  3. New 3D-Plot Folio added. New, original 3D plots. [NEW]
  4. Catastrophic Degradation Analysis added. Direct MLE solution options for Degradation Analysis added, allowing for catastrophic degradation analysis. [NEW]
  5. Publish analysis to the Synthesis Enterprise Portal:
    1. Folio information
    2. Workbook reports
    3. QCP access
    4. Plots
    5. Data
  6. Folio Properties and Categorization added. Similar to project properties, a folio includes a superset of folio properties. [NEW]
  7. Folio/datasheets can now be associated with a Metric variable. Track and plot (and even analyze) changes in analysis metrics over time. [NEW]
  8. Reliability Data Warehouse (RDW) functionality expanded and interface redesigned. [MODIFIED]
  9. ... In-process. Additional details forthcoming ...
  10. ...
  11. ...
  12. ...


BlockSimIcon.png BlockSim 10


  1. BlockSim General Enhancements. General Interface and Analysis enhancements were made. [MODIFIED] [NEW]
  2. FMRA View Expanded. Additional functionality and capability added to the BlockSim FMRA view. [MODIFIED]
  3. BlockSim Multiple Projects Open multiple projects at the same time. [NEW]
  4. BlockSim's Results Dashboard modified and expanded. [MODIFIED]
  5. BlockSim Templates available in pre-Synthesis earlier versions are reintroduced. [NEW]
  6. Diagrams can now be associated with a Metric variable. Track and plot (and even analyze) changes in analysis metrics over time.
  7. ... In-process. Additional details forthcoming ...
  8. ...
  9. ...
  10. ...


RENOIcon.png RENO 10


  1. Drag & Drop Mode enhanced and can now be used in tabbed view as well.
  2. Templates are brought back and added.
  3. Option to not automatically validate equations added.
  4. Ability to reference resources by name in the equations instead of by reference.
  5. RENO Multiple Projects. Open multiple projects at the same time.
  6. ... In-process. Additional details forthcoming ...
  7. ...
  8. ...
  9. ...


XfmeaIcon.png Xfmea 10


  1. Analyses as Resources. Analyses such as FMEAs, Risk Discovery, etc. are now resources (i.e., Linked FMEAs) and can be reused. [NEW]
  2. FMEA Import/Compare Window added. [NEW]
  3. QCPN metric added. [NEW]
  4. DFR planner is no longer an analysis in Xfmea but is now a separate project level utility application available to all Synthesis applications.
    1. Conversion considerations:
      1. In V9, DFR plans were simpler and could be added to any item in the system hierarchy.
      2. The greatly expanded V10 DFR planner is no longer item based/focused but instead project based.
      3. Upon conversion of older files, and if more than one DFR planner is in the project, the plans will be merged into a single project level DFR planner.
  5. System Hierarchy Filtered View
  6. ... In-process. Additional details forthcoming ...
  7. ...
  8. ...
  9. ...

RCMIcon.png RCM++ 10


  1. ... In-process. Additional details forthcoming ...
  2. ...
  3. ...
  4. ...


28 Lambda Predict 10


  1. FIDES
    1. A set of FIDES Phases can now be defined in a Phase Set.
    2. Two new FIDES plots.
  2. Parts Count added.
    1. Added a parts count prediction which restricts the behaviors to those allowable in a parts count.
  3. ... In-process. Additional details forthcoming ...
  4. ...
  5. ...
  6. ...


RBIIcon.png RBI 10

  1. ... Information Release Pending ... Additional details forthcoming ...
  2. ...
  3. ...
  4. ...


DOEIcon.png DOE++ 10


  1. Repeated Measurements added for standard designs with a single response. [NEW]
  2. DOE++ Multiple Projects added. [NEW]
  3. The optimization plot, overlaid contour plot and dynamic overlaid contour plot dialogs now use a tree format.
    1. Specific factors can now be held constant in the optimization plot.
  4. Ignore/Include column added to standard and robust folios.
    1. Ignored rows are not included in any of the calculations.
  5. Dialogs added to modify all factors or all responses from one spot.
  6. Central Composite factor values can be assigned based on Alpha values.
  7. New and improved Surface plot included.
    1. Basic plot functionality remains the same as the previous surface plot.
    2. Appearance is greatly improved (including anti-aliasing and legible text!).
    3. Interface has changed substantially.
    4. Available settings have been vastly expanded.
  8. ... In-process. Additional details forthcoming ...
  9. ...
  10. ...
  11. ...


RGAIcon.png RGA 10


  1. RGA Multiple Projects added. [NEW]
  2. Modifications/Improvements to multiple systems analysis (and generating the equivalent single system).
  3. Folios/datasheets can now be associated with a Metric variable.
  4. Metric variable array can be used as a data source. Track and plot (and even analyze) changes in analysis metrics over time.
  5. ... In-process. Additional details forthcoming ...
  6. ...
  7. ...
  8. ...


XFRACASIcon.png XFRACAS 10

  1. ... Information Release Pending ... Additional details forthcoming ...
  2. ...
  3. ...
  4. ...


MPCIcon.png MPC 10

  1. ... Information Release Pending ... Additional details forthcoming ...
  2. ...
  3. ...
  4. ...


Synthesis API 10

  1. Calculate compound (analytical diagram) models via an API call.
  2. ... In-process. Additional details forthcoming ...
  3. ...
  4. ...
  5. ...


New Applications Added to the Platform for Version 10

Synthesis Enterprise Portal 10 [NEW]

New application.

  1. ... Information Release Pending ... Additional details forthcoming ...
  2. ...
  3. ...
  4. ...


Markov 10 [NEW]

New application.

  1. Apply Markov analysis.
  2. Implemented in the BlockSim/RENO interface as a new diagram type. Details on this will be available on the product page when we approach release.
  3. ... In-process. Additional details forthcoming ...


The Synthesis Dashboard Designer 10 [NEW]

New application.

  1. ... Information Release Pending ... Additional details forthcoming ...
  2. ...
  3. ...
  4. ...


ReliaSoft's Course Player 10 [NEW]

A new eLearning delivery platform designed from the ground up by ReliaSoft to create and deliver ReliaSoft eCourses. Details upon release.