User contributions for Kate Racaza
Jump to navigation
Jump to search
5 July 2012
- 09:2509:25, 5 July 2012 diff hist +266 Life Data Analysis Reference Book No edit summary
- 09:2509:25, 5 July 2012 diff hist 0 Appendix: Life Data Analysis References No edit summary
- 09:2509:25, 5 July 2012 diff hist 0 Appendix: Log-Likelihood Equations No edit summary
- 09:2409:24, 5 July 2012 diff hist 0 Appendix: Special Analysis Methods No edit summary
- 09:2409:24, 5 July 2012 diff hist 0 Appendix: Maximum Likelihood Estimation Example No edit summary
- 09:2409:24, 5 July 2012 diff hist 0 Least Squares/Rank Regression Equations No edit summary
- 09:1809:18, 5 July 2012 diff hist +7,245 Least Squares/Rank Regression Equations No edit summary
- 09:0509:05, 5 July 2012 diff hist +23,978 Parameter Estimation No edit summary
- 09:0009:00, 5 July 2012 diff hist −6 Template:Probability Plotting Example (EXP1-1) No edit summary
- 08:3708:37, 5 July 2012 diff hist +15,617 Life Distributions No edit summary
- 07:4307:43, 5 July 2012 diff hist +7,764 Basic Statistical Background No edit summary
- 06:1206:12, 5 July 2012 diff hist −5 Time-Dependent System Reliability (Analytical) →Example 1
- 06:1006:10, 5 July 2012 diff hist −1 RBDs and Analytical System Reliability →Effect of Number of Components in Parallel
3 July 2012
- 14:1114:11, 3 July 2012 diff hist +42,608 Time-Varying Stress Models No edit summary
- 13:5613:56, 3 July 2012 diff hist −6 Template:Example:GLL →GLL Example
- 13:5513:55, 3 July 2012 diff hist +16,117 Multivariable Relationships: General Log-Linear and Proportional Hazards No edit summary
- 13:4913:49, 3 July 2012 diff hist −4 Template:Example:TNT →TNT Example
- 13:4813:48, 3 July 2012 diff hist +25,331 Temperature-NonThermal Relationship No edit summary
- 13:4013:40, 3 July 2012 diff hist −72 Temperature-NonThermal Relationship No edit summary
- 13:3013:30, 3 July 2012 diff hist +27,654 Temperature-Humidity Relationship No edit summary
- 13:2313:23, 3 July 2012 diff hist −68 Temperature-Humidity Relationship No edit summary
- 13:1713:17, 3 July 2012 diff hist −10 Inverse Power Law Relationship →IPL-Exponential
- 13:1613:16, 3 July 2012 diff hist +24,438 Inverse Power Law Relationship No edit summary
- 12:5912:59, 3 July 2012 diff hist +5,988 Inverse Power Law Relationship No edit summary
- 12:2412:24, 3 July 2012 diff hist +18,640 Eyring Relationship No edit summary
- 12:1112:11, 3 July 2012 diff hist +7,380 Eyring Relationship No edit summary
- 11:5211:52, 3 July 2012 diff hist +5,804 Eyring Relationship No edit summary
- 11:4511:45, 3 July 2012 diff hist +19,325 Eyring Relationship No edit summary
- 11:3111:31, 3 July 2012 diff hist +8,791 Eyring Relationship No edit summary
- 11:0511:05, 3 July 2012 diff hist +41,383 Arrhenius Relationship No edit summary
- 10:1910:19, 3 July 2012 diff hist +10,106 Arrhenius Relationship No edit summary
- 09:5809:58, 3 July 2012 diff hist +49,081 Distributions Used in Accelerated Testing No edit summary
- 07:5707:57, 3 July 2012 diff hist +58 Appendix A: Generating Random Numbers from a Distribution No edit summary
- 07:5707:57, 3 July 2012 diff hist +23 Appendix B: References No edit summary
- 07:4607:46, 3 July 2012 diff hist +7,577 Repairable Systems Analysis Through Simulation No edit summary
- 06:5006:50, 3 July 2012 diff hist −1 Reliability Importance and Optimized Reliability Allocation (Analytical) No edit summary
- 06:3506:35, 3 July 2012 diff hist +3,068 Time-Dependent System Reliability (Analytical) No edit summary
2 July 2012
- 14:3114:31, 2 July 2012 diff hist +3,564 RBDs and Analytical System Reliability No edit summary
- 13:4513:45, 2 July 2012 diff hist +15,248 Basics of System Reliability Analysis No edit summary
- 13:2013:20, 2 July 2012 diff hist +663 Accelerated Life Testing Data Analysis Reference No edit summary
- 13:1213:12, 2 July 2012 diff hist +37 Template:Altalink No edit summary
- 12:0912:09, 2 July 2012 diff hist +25 Appendix E: References No edit summary
- 12:0812:08, 2 July 2012 diff hist +31 Appendix D: Confidence Bounds No edit summary
- 11:4811:48, 2 July 2012 diff hist +32 Appendix C: Benchmark Examples No edit summary
- 11:4711:47, 2 July 2012 diff hist +34 Appendix B: Parameter Estimation No edit summary
- 11:4411:44, 2 July 2012 diff hist +42 Appendix A: Brief Statistical Background No edit summary
- 11:1311:13, 2 July 2012 diff hist +4,644 Accelerated Life Testing and ALTA No edit summary
- 11:0211:02, 2 July 2012 diff hist −2,526 Template:Alta data types No edit summary
- 10:5210:52, 2 July 2012 diff hist −498 Life Data Classification No edit summary
- 10:4710:47, 2 July 2012 diff hist +5 Template:Left Censored No edit summary
- 10:4610:46, 2 July 2012 diff hist 0 Template:Left Censored No edit summary
- 10:4510:45, 2 July 2012 diff hist −21 Template:Interval Censored No edit summary
- 10:4210:42, 2 July 2012 diff hist +16 Template:Right Censored No edit summary
- 10:3710:37, 2 July 2012 diff hist 0 Template:Complete Data No edit summary
- 10:3510:35, 2 July 2012 diff hist −294 Template:Complete Data No edit summary
- 10:1310:13, 2 July 2012 diff hist +3,355 Introduction to Accelerated Life Testing No edit summary
- 09:4909:49, 2 July 2012 diff hist +1,231 Introduction to Life Data Analysis No edit summary
- 09:2009:20, 2 July 2012 diff hist +32 Appendix: Life Data Analysis References No edit summary
- 09:1809:18, 2 July 2012 diff hist +62 Appendix: Log-Likelihood Equations No edit summary
- 09:1109:11, 2 July 2012 diff hist −8 Grouped Data Parameter Estimation Redirected page to Appendix: Special Analysis Methods
- 09:1109:11, 2 July 2012 diff hist +22 ReliaSoft's Alternate Ranking Method Redirected page to Appendix: Special Analysis Methods#ReliaSoft's Ranking Method (RRM)
- 09:1009:10, 2 July 2012 diff hist +14,709 Appendix: Special Analysis Methods No edit summary
- 08:5508:55, 2 July 2012 diff hist 0 Appendix: Maximum Likelihood Estimation Example No edit summary
- 08:5208:52, 2 July 2012 diff hist +20 Weibull++ SimuMatic No edit summary
- 08:5108:51, 2 July 2012 diff hist +40 Appendix: Maximum Likelihood Estimation Example No edit summary
- 08:4808:48, 2 July 2012 diff hist +67 Risk Analysis and Probabilistic Design with Monte Carlo Simulation No edit summary
- 08:4708:47, 2 July 2012 diff hist +24 Target Reliability Tool No edit summary
- 08:4708:47, 2 July 2012 diff hist +25 Stress-Strength Analysis No edit summary
- 08:4708:47, 2 July 2012 diff hist +25 Comparing Life Data Sets No edit summary
29 June 2012
- 12:0612:06, 29 June 2012 diff hist +36 Appendix: Maximum Likelihood Estimation Example No edit summary
- 10:4510:45, 29 June 2012 diff hist +10,568 Target Reliability Tool No edit summary
- 10:4010:40, 29 June 2012 diff hist +3,434 Weibull++ SimuMatic No edit summary
- 10:3610:36, 29 June 2012 diff hist +1 Risk Analysis and Probabilistic Design with Monte Carlo Simulation No edit summary
- 10:3610:36, 29 June 2012 diff hist +674 Risk Analysis and Probabilistic Design with Monte Carlo Simulation No edit summary
- 10:3310:33, 29 June 2012 diff hist −29 Comparing Life Data Sets No edit summary
- 10:3310:33, 29 June 2012 diff hist +5,490 Comparing Life Data Sets No edit summary
- 10:1610:16, 29 June 2012 diff hist −60 Stress-Strength Analysis No edit summary
- 10:1610:16, 29 June 2012 diff hist +63 Stress-Strength Analysis No edit summary
- 10:1010:10, 29 June 2012 diff hist +10 Life Data Analysis Reference Book No edit summary
- 09:4409:44, 29 June 2012 diff hist +7,387 Stress-Strength Analysis No edit summary
- 09:3809:38, 29 June 2012 diff hist −10 Life Data Analysis Reference Book No edit summary
- 09:2609:26, 29 June 2012 diff hist +1,129 Life Data Analysis Reference Book No edit summary
- 09:2409:24, 29 June 2012 diff hist +19 Template:Ldalink No edit summary
- 08:0908:09, 29 June 2012 diff hist −31 Template:Design Design Using Expected Failure Time Plots Redirected page to Reliability Test Design current
- 08:0908:09, 29 June 2012 diff hist −31 Difference Detection Matrix Redirected page to Reliability Test Design current
- 08:0508:05, 29 June 2012 diff hist −2,048 Template:Difference detection matrix Redirected page to Reliability Test Design current
- 08:0508:05, 29 June 2012 diff hist −2,918 Template:Expected failure time plots Redirected page to Reliability Test Design current
- 08:0508:05, 29 June 2012 diff hist −47 Template:Test Design Using Expected Failure Time Plots Redirected page to Reliability Test Design current
- 08:0408:04, 29 June 2012 diff hist +6 Test Design Using Expected Failure Time Plots Redirected page to Reliability Test Design current
- 08:0408:04, 29 June 2012 diff hist −47 Template:Bayesian Nonparametric Test Design Redirected page to Reliability Test Design current
- 08:0408:04, 29 June 2012 diff hist −1,478 Template:Bayesian test design Redirected page to Reliability Test Design current
- 08:0308:03, 29 June 2012 diff hist −608 Template:Nonparametric test design Redirected page to Reliability Test Design current
- 08:0308:03, 29 June 2012 diff hist −732 Template:Determining test time for available units Redirected page to Reliability Test Design current
- 08:0308:03, 29 June 2012 diff hist −1,487 Template:Determining units for available test time Redirected page to Reliability Test Design current
- 08:0308:03, 29 June 2012 diff hist −1,396 Template:Reliability demonstration Redirected page to Reliability Test Design current
- 08:0208:02, 29 June 2012 diff hist −1,652 Template:Demonstration test design Redirected page to Reliability Test Design current
- 08:0208:02, 29 June 2012 diff hist −1,090 Template:Reliability test design Redirected page to Reliability Test Design current
- 07:4907:49, 29 June 2012 diff hist +23,545 Recurrent Event Data Analysis Undo revision 25813 by Kate Racaza (Talk)
- 07:4907:49, 29 June 2012 diff hist −23,545 Recurrent Event Data Analysis Redirected page to Recurrent Event Data Analysis
- 07:4907:49, 29 June 2012 diff hist −2,863 Template:Grp model Redirected page to Recurrent Event Data Analysis current